GCF/B.37/05/Add.01: Project Preparation Facility: revised operating modalities, activities and funding – Addendum I: Response matrix for Board comments received on the draft document
Download
English |
PDF |
284.75 KB
GCF/B.37/05/Add.01: Project Preparation Facility: revised operating modalities, activities and funding – Addendum I: Response matrix for Board comments received on the draft document
This document contains the response matrix for Board comments received on the draft document titled “Project Preparation Facility: revised operating modalities, activities and funding” during the Board consultation period held from 7 to 15 September 2023.
Document symbol
GCF/B.37/05/Add.01
Document type
Action item
Board meeting
B.37
Cover date
02 October 2023