GCF/B.39/07: Consideration of funding proposals: Consideration of a request for changes in the scope of funded activity FP037 (“Integrated Flood Management to Enhance Climate Resilience of the Vaisigano River Catchment in Samoa”)
Download
English |
PDF |
14.67 MB
GCF/B.39/07: Consideration of funding proposals: Consideration of a request for changes in the scope of funded activity FP037 (“Integrated Flood Management to Enhance Climate Resilience of the Vaisigano River Catchment in Samoa”)
This document presents a request to approve a change in the scope of the funded activity FP037 by cancelling the construction of flood walls in segments 2 and 3 of the Vaisigano River and of the Lelata bridge upgrade with consequential changes to the project logical framework and budget.
Document symbol
GCF/B.39/07
Document type
Action item
Board meeting
B.39
Cover date
24 June 2024