GCF/B.39/07: Consideration of funding proposals: Consideration of a request for changes in the scope of funded activity FP037 (“Integrated Flood Management to Enhance Climate Resilience of the Vaisigano River Catchment in Samoa”)

Document cover for Consideration of funding proposals: Consideration of a request for changes in the scope of funded activity FP037 (“Integrated Flood Management to Enhance Climate Resilience of the Vaisigano River Catchment in Samoa”)
Download
English | PDF | 14.67 MB

GCF/B.39/07: Consideration of funding proposals: Consideration of a request for changes in the scope of funded activity FP037 (“Integrated Flood Management to Enhance Climate Resilience of the Vaisigano River Catchment in Samoa”)

This document presents a request to approve a change in the scope of the funded activity FP037 by cancelling the construction of flood walls in segments 2 and 3 of the Vaisigano River and of the Lelata bridge upgrade with consequential changes to the project logical framework and budget.

Document symbol GCF/B.39/07
Document type
Action item
Board meeting
B.39
Cover date 24 June 2024